US$ 19.80
Pay in 4 interest-free payments of $11.24 Learn more
• Appropriate couplings attached
CDE-Booster via 10789
Grade crossing/rerailing track
can also be used with the Vari Girder (Ref
Sound files produced specifically for the Graham Farish Class 158 using recordings from real units
4P-020-511 GWR Toplight Mainline City BR Maroon All Second 3911 Set 6 Foliage • Appropriate couplings attachedThe first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 19.80
US$ 1125.00
US$ 164.97